Réponse de Griffin :
<font class="small">Code:</font><hr /><pre> Herve,
Thank you for your email. After a slight delay, the iTrip is finally HERE!!
The iTrip hits the street on or around April 25th. The units are in
production as we speak and between the manufacturing process, batch testing,
and shipment receipt, we are establishing a three week lead time for
completion. According to the production schedule, product should be
shipping in every day. As fast as they can make them, they are supposed to
ship them, and that should mean a minimal inconvenience to tackling latter
pre-orders. We apologize for the delay and look forward to bringing you the
iTrip.
Doug Sadtler
Griffin Technology </pre><hr />
Alez hop, la derniere ligne droite
<font class="small">Code:</font><hr /><pre> Herve,
Thank you for your email. After a slight delay, the iTrip is finally HERE!!
The iTrip hits the street on or around April 25th. The units are in
production as we speak and between the manufacturing process, batch testing,
and shipment receipt, we are establishing a three week lead time for
completion. According to the production schedule, product should be
shipping in every day. As fast as they can make them, they are supposed to
ship them, and that should mean a minimal inconvenience to tackling latter
pre-orders. We apologize for the delay and look forward to bringing you the
iTrip.
Doug Sadtler
Griffin Technology </pre><hr />